Mezhyhiria: 1,023 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 5.6% below the oblast median (1,084). #247 of 264 in the rayon, #1483 of 1532 in the oblast.

Sambir, the rayon centre, is 55 km away. 673 m above sea level — above 500 m the DBN snow and wind are higher. 47 km away: Drohobych, the nearest bigger centre, 1,073 — 4.7% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 74 km. 10.97 m between rows, pitch 14.84 m (latitude 49.0°).

Yield of 1 kWp
1,023kWh/year
Tilt
36°1° east of south
10 kW
10,226kWh/year
Row pitch
14.84m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Mezhyhiria

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 74 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan56Feb86Mar106Apr114May117Jun125Jul126Aug101Sep79Oct45Nov28Dec

August: 126 kWh/kWp, December: 28 — 4.5 times less.

December: 28 against 32 in the oblast, 12.5% less.

Mezhyhiria: plants, kWh
kWpA yearAugustDecember
55,113630140
1010,2261,260280
1515,3391,890420

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sambirskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.