Solar plant: site data

Solar power plant in Lysiatychi, Stryiskyi Raion, Lviv Oblast

Lysiatychi: 1,092 kWh per kWp a year, tilt 38° 1° west of south (PVGIS). 0.7% above the oblast median (1,084). #113 of 286 in the rayon, #412 of 1532 in the oblast.

Stryi, the rayon centre, is 12 km away. 271 m above sea level. 12 km away: Stryi, the nearest bigger centre, 1,085 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Львів, 56 km. 11.76 m between rows, pitch 15.53 m (latitude 49.3°).

Yield of 1 kWp
1,092kWh/year
Tilt
38°1° west of south
10 kW
10,915kWh/year
Row pitch
15.53m · GCR 0.31
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Lysiatychi

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Львів, 56 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan57Feb93Mar115Apr124May125Jun132Jul131Aug109Sep85Oct45Nov34Dec

July: 132 kWh/kWp, December: 34 — 3.9 times less.

January: 42 against 39 in the oblast, 7.7% more.

Lysiatychi: plants, kWh
kWpA yearJulyDecember
55,458660170
1010,9151,320340
1516,3731,980510

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Stryiskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.