Solar plant: site data

Solar power plant in Kruhiv, Zolochivskyi Raion, Lviv Oblast

Kruhiv: 1,058 kWh per kWp a year, tilt 35° 2° east of south (PVGIS). 2.4% below the oblast median (1,084). #178 of 180 in the rayon, #1345 of 1532 in the oblast.

Zolochiv, the rayon centre, is 16 km away. 340 m above sea level. 16 km away: Zolochiv, the nearest bigger centre, 1,081 — 2.1% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 46 km. 11.37 m between rows, pitch 15.29 m (latitude 49.8°).

Yield of 1 kWp
1,058kWh/year
Tilt
35°2° east of south
10 kW
10,581kWh/year
Row pitch
15.29m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Kruhiv

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 46 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

27Jan50Feb92Mar116Apr128May132Jun137Jul134Aug109Sep82Oct33Nov20Dec

July: 137 kWh/kWp, December: 20 — 6.9 times less.

December: 20 against 32 in the oblast, 37.5% less.

Kruhiv: plants, kWh
kWpA yearJulyDecember
55,291685100
1010,5811,370200
1515,8712,055300

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolochivskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.