Solar plant: site data

Solar power plant in Chishki, Yavorivskyi Raion, Lviv Oblast

Chishki: 1,074 kWh per kWp a year, tilt 38° 3° west of south (PVGIS). 0.9% below the oblast median (1,084). #130 of 148 in the rayon, #1216 of 1532 in the oblast.

Yavoriv, the rayon centre, is 28 km away. 249 m above sea level. 28 km away: Yavoriv, the nearest bigger centre, 1,085 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Львів, 67 km. 12.14 m between rows, pitch 15.91 m (latitude 49.8°).

Yield of 1 kWp
1,074kWh/year
Tilt
38°3° west of south
10 kW
10,741kWh/year
Row pitch
15.91m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Chishki

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Львів, 67 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan52Feb93Mar115Apr124May127Jun133Jul131Aug107Sep82Oct44Nov30Dec

July: 133 kWh/kWp, December: 30 — 4.4 times less.

January: 36 against 39 in the oblast, 7.7% less.

Chishki: plants, kWh
kWpA yearJulyDecember
55,371665150
1010,7411,330300
1516,1111,995450

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yavorivskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.