Solar plant: site data

Solar power plant in Putylyne, Shchastynskyi Raion, Luhansk Oblast

Putylyne: 1,144 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.5% below the oblast median (1,150). #76 of 83 in the rayon, #625 of 964 in the oblast.

Novoaidar, the rayon centre, is 18 km away. 128 m above sea level. 18 km away: Novoaidar, the nearest bigger centre, 1,155 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 230 km. 11.08 m between rows, pitch 14.90 m (latitude 48.8°).

Yield of 1 kWp
1,144kWh/year
Tilt
37°1° east of south
10 kW
11,439kWh/year
Row pitch
14.90m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Putylyne

The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Харків, 230 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan59Feb91Mar115Apr137May140Jun142Jul145Aug121Sep84Oct43Nov27Dec

August: 145 kWh/kWp, December: 27 — 5.4 times less.

February: 59 against 56 in the oblast, 5.4% more.

Putylyne: plants, kWh
kWpA yearAugustDecember
55,720725135
1011,4391,450270
1517,1592,175405

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shchastynskyi RaionLuhansk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.