Solar plant: site data
Solar power plant in Novochervone, Svativskyi Raion, Luhansk Oblast
Novochervone: 1,126 kWh per kWp a year, tilt 36° facing south (PVGIS). 2.1% below the oblast median (1,150). #176 of 189 in the rayon, #946 of 964 in the oblast.
Svatove, the rayon centre, is 27 km away. 108 m above sea level. 27 km away: Svatove, the nearest bigger centre, the same 1,131. Snow and wind from the nearest regional centre in the DBN — Харків, 154 km. 11.48 m between rows, pitch 15.35 m (latitude 49.6°).
- Yield of 1 kWp
- 1,126kWh/year
- Tilt
- 36°facing south
- 10 kW
- 11,259kWh/year
- Row pitch
- 15.35m · GCR 0.31
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,600 / 430Pa
Ground frame designer
A ground frame for a solar plant: Novochervone
The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Харків, 154 km: snow 1,600 Pa, wind 430 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 147 kWh/kWp, December: 22 — 6.7 times less.
December: 22 against 26 in the oblast, 15.4% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,630 | 735 | 110 |
| 10 | 11,259 | 1,470 | 220 |
| 15 | 16,889 | 2,205 | 330 |
Example: a 10 kW ground frame
For the loads of Kharkiv: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.
How these numbers are computed
Nearby
- Tarasivka7 km1,125 kWh/kWp
- Novonykanorivka8 km1,133 kWh/kWp
- Tverdokhlibove9 km1,131 kWh/kWp
- Mankivka9 km1,131 kWh/kWp
- Vestativka9 km1,132 kWh/kWp
- Oleksandrivka9 km1,134 kWh/kWp
All places: Svativskyi RaionLuhansk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.