Solar plant: site data

Solar power plant in Chabanivka, Siverskodonetskyi Raion, Luhansk Oblast

Chabanivka: 1,149 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,150). #63 of 100 in the rayon, #508 of 964 in the oblast.

Siverskodonetsk, the rayon centre, is 22 km away. 158 m above sea level. 19 km away: Novoaidar, the nearest bigger centre, 1,155 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 212 km. 11.24 m between rows, pitch 15.06 m (latitude 49.0°).

Yield of 1 kWp
1,149kWh/year
Tilt
37°1° east of south
10 kW
11,490kWh/year
Row pitch
15.06m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Chabanivka

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Харків, 212 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

43Jan60Feb92Mar115Apr136May140Jun144Jul146Aug121Sep84Oct42Nov25Dec

August: 146 kWh/kWp, December: 25 — 5.8 times less.

January: 43 against 39 in the oblast, 10.3% more.

Chabanivka: plants, kWh
kWpA yearAugustDecember
55,745730125
1011,4901,460250
1517,2352,190375

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Siverskodonetskyi RaionLuhansk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.