Solar plant: site data

Solar power plant in Shupyky, Obukhivskyi Raion, Kyiv Oblast

Shupyky: 1,138 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 1.4% above the oblast median (1,122). #49 of 155 in the rayon, #106 of 1071 in the oblast.

Obukhiv, the rayon centre, is 62 km away. 167 m above sea level. 31 km away: Korsun-Shevchenkivskyi, the nearest bigger centre, the same 1,141. Snow and wind from the nearest regional centre in the DBN — Черкаси, 85 km. 11.72 m between rows, pitch 15.54 m (latitude 49.6°).

Yield of 1 kWp
1,138kWh/year
Tilt
37°3° east of south
10 kW
11,375kWh/year
Row pitch
15.54m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Shupyky

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 85 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb96Mar117Apr137May142Jun145Jul141Aug115Sep85Oct37Nov28Dec

July: 145 kWh/kWp, December: 28 — 5.2 times less.

January: 36 against 34 in the oblast, 5.9% more.

Shupyky: plants, kWh
kWpA yearJulyDecember
55,688725140
1011,3751,450280
1517,0632,175420

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Obukhivskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.