Solar plant: site data

Solar power plant in Rovy, Vyshhorodskyi Raion, Kyiv Oblast

Rovy: 1,110 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 1.1% below the oblast median (1,122). #21 of 169 in the rayon, #848 of 1071 in the oblast.

Vyshhorod, the rayon centre, is 35 km away. 130 m above sea level. 35 km away: Vyshhorod, the nearest bigger centre, the same 1,112. Snow and wind from the nearest regional centre in the DBN — Київ, 50 km. 13.26 m between rows, pitch 17.03 m (latitude 50.9°).

Yield of 1 kWp
1,110kWh/year
Tilt
38°3° east of south
10 kW
11,102kWh/year
Row pitch
17.03m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Rovy

The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Київ, 50 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan56Feb96Mar119Apr136May140Jun140Jul135Aug113Sep79Oct34Nov26Dec

June: 140 kWh/kWp, December: 26 — 5.4 times less.

January: 36 against 34 in the oblast, 5.9% more.

Rovy: plants, kWh
kWpA yearJuneDecember
55,551700130
1011,1021,400260
1516,6532,100390

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed