Solar plant: site data

Solar power plant in Musiiky, Vyshhorodskyi Raion, Kyiv Oblast

Musiiky: 1,107 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 1.4% below the oblast median (1,122). #28 of 169 in the rayon, #877 of 1071 in the oblast.

Vyshhorod, the rayon centre, is 72 km away. 142 m above sea level. 64 km away: Bucha, the nearest bigger centre, 1,092 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Київ, 85 km. 13.45 m between rows, pitch 17.22 m (latitude 51.1°).

Yield of 1 kWp
1,107kWh/year
Tilt
38°3° east of south
10 kW
11,068kWh/year
Row pitch
17.22m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Musiiky

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Київ, 85 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb95Mar118Apr134May141Jun139Jul134Aug111Sep78Oct34Nov28Dec

June: 141 kWh/kWp, December: 28 — 5.0 times less.

January: 36 against 34 in the oblast, 5.9% more.

Musiiky: plants, kWh
kWpA yearJuneDecember
55,534705140
1011,0681,410280
1516,6022,115420

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vyshhorodskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.