Solar plant: site data

Solar power plant in Mostyshche, Fastivskyi Raion, Kyiv Oblast

Mostyshche: 1,107 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 1.4% below the oblast median (1,122). #94 of 96 in the rayon, #880 of 1071 in the oblast.

Fastiv, the rayon centre, is 26 km away. 143 m above sea level. 26 km away: Fastiv, the nearest bigger centre, 1,119 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Київ, 39 km. 12.65 m between rows, pitch 16.42 m (latitude 50.3°).

Yield of 1 kWp
1,107kWh/year
Tilt
38°4° east of south
10 kW
11,067kWh/year
Row pitch
16.42m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Mostyshche

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Київ, 39 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan54Feb94Mar118Apr134May139Jun140Jul135Aug111Sep81Oct35Nov27Dec

July: 140 kWh/kWp, December: 27 — 5.2 times less.

January: 37 against 34 in the oblast, 8.8% more.

Mostyshche: plants, kWh
kWpA yearJulyDecember
55,534700135
1011,0671,400270
1516,6012,100405

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Fastivskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.