Solar plant: site data

Solar power plant in Lisnyky, Obukhivskyi Raion, Kyiv Oblast

Lisnyky: 1,126 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). Exactly the oblast median (1,122). #114 of 155 in the rayon, #407 of 1071 in the oblast.

Obukhiv, the rayon centre, is 22 km away. 124 m above sea level. 17 km away: Kyiv, the nearest bigger centre, 1,114 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Київ, 16 km. 12.66 m between rows, pitch 16.43 m (latitude 50.3°).

Yield of 1 kWp
1,126kWh/year
Tilt
38°3° east of south
10 kW
11,256kWh/year
Row pitch
16.43m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Lisnyky

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Київ, 16 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan56Feb96Mar119Apr136May141Jun143Jul138Aug112Sep81Oct36Nov29Dec

July: 143 kWh/kWp, December: 29 — 4.9 times less.

January: 37 against 34 in the oblast, 8.8% more.

Lisnyky: plants, kWh
kWpA yearJulyDecember
55,628715145
1011,2561,430290
1516,8842,145435

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Obukhivskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.