Solar plant: site data

Solar power plant in Chornohorodka, Fastivskyi Raion, Kyiv Oblast

Chornohorodka: 1,108 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 1.3% below the oblast median (1,122). #92 of 96 in the rayon, #868 of 1071 in the oblast.

Fastiv, the rayon centre, is 16 km away. 133 m above sea level. 16 km away: Fastiv, the nearest bigger centre, 1,119 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Київ, 46 km. 12.58 m between rows, pitch 16.35 m (latitude 50.2°).

Yield of 1 kWp
1,108kWh/year
Tilt
38°4° east of south
10 kW
11,075kWh/year
Row pitch
16.35m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Chornohorodka

The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Київ, 46 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan54Feb94Mar118Apr134May139Jun140Jul135Aug111Sep81Oct35Nov28Dec

July: 140 kWh/kWp, December: 28 — 5.0 times less.

January: 38 against 34 in the oblast, 11.8% more.

Chornohorodka: plants, kWh
kWpA yearJulyDecember
55,538700140
1011,0751,400280
1516,6132,100420

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Fastivskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.