Solar plant: site data

Solar power plant in Biivtsi, Obukhivskyi Raion, Kyiv Oblast

Biivtsi: 1,144 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 2.0% above the oblast median (1,122). #11 of 155 in the rayon, #29 of 1071 in the oblast.

Obukhiv, the rayon centre, is 73 km away. 140 m above sea level. 21 km away: Korsun-Shevchenkivskyi, the nearest bigger centre, the same 1,141. Snow and wind from the nearest regional centre in the DBN — Черкаси, 78 km. 11.63 m between rows, pitch 15.45 m (latitude 49.5°).

Yield of 1 kWp
1,144kWh/year
Tilt
37°3° east of south
10 kW
11,442kWh/year
Row pitch
15.45m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Biivtsi

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 78 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan58Feb98Mar117Apr137May141Jun145Jul142Aug115Sep86Oct39Nov30Dec

July: 145 kWh/kWp, December: 30 — 4.8 times less.

January: 38 against 34 in the oblast, 11.8% more.

Biivtsi: plants, kWh
kWpA yearJulyDecember
55,721725150
1011,4421,450300
1517,1632,175450

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Obukhivskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.