Solar plant: site data

Solar power plant in Katsiveli, Yaltynskyi Raion, Autonomous Republic of Crimea

Katsiveli: 1,344 kWh per kWp a year, tilt 35° 1° east of south (PVGIS). 4.7% above the oblast median (1,284). #5 of 58 in the rayon, #42 of 1025 in the oblast.

Yalta, the rayon centre, is 19 km away. 68 m above sea level. 19 km away: Yalta, the nearest bigger centre, 1,313 — 2.4% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 271 km. 7.97 m between rows, pitch 11.89 m (latitude 44.4°).

Yield of 1 kWp
1,344kWh/year
Tilt
35°1° east of south
10 kW
13,444kWh/year
Row pitch
11.89m · GCR 0.40
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Katsiveli

The designer opens with this place’s coordinates, latitude 44.4° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 271 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

54Jan70Feb108Mar135Apr147May153Jun162Jul160Aug134Sep104Oct66Nov52Dec

July: 162 kWh/kWp, December: 52 — 3.1 times less.

December: 52 against 45 in the oblast, 15.6% more.

Katsiveli: plants, kWh
kWpA yearJulyDecember
56,722810260
1013,4441,620520
1520,1662,430780

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yaltynskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.