Solar plant: site data
Solar power plant in Tarasovo-Shevchenkove, Oleksandriiskyi Raion, Kirovohrad Oblast
Tarasovo-Shevchenkove: 1,157 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,157). #122 of 191 in the rayon, #354 of 708 in the oblast.
Oleksandriya, the rayon centre, is 31 km away. 184 m above sea level. 30 km away: Onufriyivka, the nearest bigger centre, 1,173 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 95 km. 10.67 m between rows, pitch 14.54 m (latitude 48.6°).
- Yield of 1 kWp
- 1,157kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,574kWh/year
- Row pitch
- 14.54m · GCR 0.33
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,230 / 410Pa
Ground frame designer
A ground frame for a solar plant: Tarasovo-Shevchenkove
The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 95 km: snow 1,230 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 152 kWh/kWp, December: 27 — 5.6 times less.
March: 89 against 93 in the oblast, 4.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,787 | 760 | 135 |
| 10 | 11,574 | 1,520 | 270 |
| 15 | 17,361 | 2,280 | 405 |
Example: a 10 kW ground frame
For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.
How these numbers are computed
Nearby
- Zelena Balka3 km1,154 kWh/kWp
- Zelene4 km1,155 kWh/kWp
- Mykhailivka5 km1,162 kWh/kWp
- Travneve6 km1,155 kWh/kWp
- Ulianivka6 km1,157 kWh/kWp
- Chervona Kamianka7 km1,156 kWh/kWp
All places: Oleksandriiskyi RaionKirovohrad Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.