Solar plant: site data

Solar power plant in Tarasivka, Holovanivskyi Raion, Kirovohrad Oblast

Tarasivka: 1,149 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.7% below the oblast median (1,157). #138 of 171 in the rayon, #608 of 708 in the oblast.

Hayvoron, the rayon centre, is 61 km away. 153 m above sea level. 20 km away: Novoarkhanhelsk, the nearest bigger centre, the same 1,148. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 118 km. 10.58 m between rows, pitch 14.45 m (latitude 48.5°).

Yield of 1 kWp
1,149kWh/year
Tilt
36°2° east of south
10 kW
11,494kWh/year
Row pitch
14.45m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Tarasivka

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 118 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan53Feb93Mar120Apr138May141Jun149Jul145Aug118Sep90Oct40Nov29Dec

July: 149 kWh/kWp, December: 29 — 5.1 times less.

December: 29 against 28 in the oblast, 3.6% more.

Tarasivka: plants, kWh
kWpA yearJulyDecember
55,747745145
1011,4941,490290
1517,2412,235435

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Holovanivskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.