Solar plant: site data

Solar power plant in Stepanivka, Kropyvnytskyi Raion, Kirovohrad Oblast

Stepanivka: 1,170 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.1% above the oblast median (1,157). #47 of 254 in the rayon, #85 of 708 in the oblast.

Kropyvnytskyi, the rayon centre, is 53 km away. 87 m above sea level. 12 km away: Ustynivka, the nearest bigger centre, the same 1,168. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 54 km. 10.24 m between rows, pitch 14.11 m (latitude 48.0°).

Yield of 1 kWp
1,170kWh/year
Tilt
36°4° east of south
10 kW
11,697kWh/year
Row pitch
14.11m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Stepanivka

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 54 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan52Feb93Mar121Apr138May142Jun153Jul148Aug123Sep93Oct43Nov28Dec

July: 153 kWh/kWp, December: 28 — 5.5 times less.

November: 43 against 41 in the oblast, 4.9% more.

Stepanivka: plants, kWh
kWpA yearJulyDecember
55,849765140
1011,6971,530280
1517,5462,295420

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kropyvnytskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.