Solar plant: site data

Solar power plant in Pokrovske, Holovanivskyi Raion, Kirovohrad Oblast

Pokrovske: 1,159 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). Exactly the oblast median (1,157). #51 of 171 in the rayon, #298 of 708 in the oblast.

Hayvoron, the rayon centre, is 8 km away. 175 m above sea level. 8 km away: Hayvoron, the nearest bigger centre, the same 1,157. Snow and wind from the nearest regional centre in the DBN — Вінниця, 145 km. 10.41 m between rows, pitch 14.28 m (latitude 48.3°).

Yield of 1 kWp
1,159kWh/year
Tilt
36°3° east of south
10 kW
11,589kWh/year
Row pitch
14.28m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Pokrovske

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 145 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan52Feb95Mar120Apr138May141Jun148Jul145Aug118Sep90Oct43Nov31Dec

July: 148 kWh/kWp, December: 31 — 4.8 times less.

December: 31 against 28 in the oblast, 10.7% more.

Pokrovske: plants, kWh
kWpA yearJulyDecember
55,795740155
1011,5891,480310
1517,3842,220465

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Holovanivskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.