Solar plant: site data

Solar power plant in Podorozhnie, Oleksandriiskyi Raion, Kirovohrad Oblast

Podorozhnie: 1,179 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.8% above the oblast median (1,157). #8 of 191 in the rayon, #19 of 708 in the oblast.

Oleksandriya, the rayon centre, is 42 km away. 145 m above sea level. 13 km away: Svitlovodsk, the nearest bigger centre, the same 1,177. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 84 km. 11.25 m between rows, pitch 15.07 m (latitude 49.0°).

Yield of 1 kWp
1,179kWh/year
Tilt
37°2° east of south
10 kW
11,785kWh/year
Row pitch
15.07m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Podorozhnie

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 84 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan57Feb99Mar122Apr140May146Jun151Jul148Aug121Sep88Oct40Nov29Dec

July: 151 kWh/kWp, December: 29 — 5.2 times less.

February: 57 against 52 in the oblast, 9.6% more.

Podorozhnie: plants, kWh
kWpA yearJulyDecember
55,893755145
1011,7851,510290
1517,6782,265435

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Oleksandriiskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.