Solar plant: site data

Solar power plant in Peremozhne, Kropyvnytskyi Raion, Kirovohrad Oblast

Peremozhne: 1,172 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.3% above the oblast median (1,157). #33 of 254 in the rayon, #64 of 708 in the oblast.

Kropyvnytskyi, the rayon centre, is 64 km away. 126 m above sea level. 14 km away: Ustynivka, the nearest bigger centre, the same 1,168. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 64 km. 10.17 m between rows, pitch 14.04 m (latitude 47.9°).

Yield of 1 kWp
1,172kWh/year
Tilt
36°3° east of south
10 kW
11,723kWh/year
Row pitch
14.04m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Peremozhne

The designer opens with this place’s coordinates, latitude 47.9° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 64 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan52Feb94Mar122Apr138May141Jun153Jul148Aug123Sep93Oct44Nov29Dec

July: 153 kWh/kWp, December: 29 — 5.3 times less.

November: 44 against 41 in the oblast, 7.3% more.

Peremozhne: plants, kWh
kWpA yearJulyDecember
55,862765145
1011,7231,530290
1517,5852,295435

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kropyvnytskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.