Solar plant: site data

Solar power plant in Novyi Starodub, Oleksandriiskyi Raion, Kirovohrad Oblast

Novyi Starodub: 1,164 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.6% above the oblast median (1,157). #73 of 191 in the rayon, #176 of 708 in the oblast.

Oleksandriya, the rayon centre, is 18 km away. 85 m above sea level. 18 km away: Oleksandriya, the nearest bigger centre, 1,156 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 67 km. 10.58 m between rows, pitch 14.45 m (latitude 48.5°).

Yield of 1 kWp
1,164kWh/year
Tilt
36°3° east of south
10 kW
11,639kWh/year
Row pitch
14.45m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Novyi Starodub

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 67 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan52Feb91Mar120Apr140May145Jun150Jul147Aug122Sep90Oct42Nov28Dec

July: 150 kWh/kWp, December: 28 — 5.4 times less.

January: 36 against 35 in the oblast, 2.9% more.

Novyi Starodub: plants, kWh
kWpA yearJulyDecember
55,820750140
1011,6391,500280
1517,4592,250420

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed