Solar plant: site data

Solar power plant in Novomykolaivka, Kropyvnytskyi Raion, Kirovohrad Oblast

Novomykolaivka: 1,177 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.7% above the oblast median (1,157). #16 of 254 in the rayon, #29 of 708 in the oblast.

Kropyvnytskyi, the rayon centre, is 74 km away. 93 m above sea level. 24 km away: Bobrynets, the nearest bigger centre, 1,167 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 74 km. 10.10 m between rows, pitch 13.97 m (latitude 47.8°).

Yield of 1 kWp
1,177kWh/year
Tilt
36°3° east of south
10 kW
11,770kWh/year
Row pitch
13.97m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Novomykolaivka

The designer opens with this place’s coordinates, latitude 47.8° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 74 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb95Mar121Apr137May140Jun154Jul150Aug124Sep94Oct45Nov30Dec

July: 154 kWh/kWp, December: 30 — 5.1 times less.

November: 45 against 41 in the oblast, 9.8% more.

Novomykolaivka: plants, kWh
kWpA yearJulyDecember
55,885770150
1011,7701,540300
1517,6552,310450

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kropyvnytskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.