Solar plant: site data

Solar power plant in Myronivka, Oleksandriiskyi Raion, Kirovohrad Oblast

Myronivka: 1,173 kWh per kWp a year, tilt 36° facing south (PVGIS). 1.4% above the oblast median (1,157). #28 of 191 in the rayon, #57 of 708 in the oblast.

Oleksandriya, the rayon centre, is 26 km away. 119 m above sea level. 20 km away: Svitlovodsk, the nearest bigger centre, the same 1,177. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 76 km. 10.88 m between rows, pitch 14.75 m (latitude 48.9°).

Yield of 1 kWp
1,173kWh/year
Tilt
36°facing south
10 kW
11,731kWh/year
Row pitch
14.75m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Myronivka

The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 76 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan56Feb97Mar121Apr140May146Jun150Jul148Aug121Sep89Oct40Nov27Dec

July: 150 kWh/kWp, December: 27 — 5.6 times less.

February: 56 against 52 in the oblast, 7.7% more.

Myronivka: plants, kWh
kWpA yearJulyDecember
55,866750135
1011,7311,500270
1517,5972,250405

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Oleksandriiskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.