Solar plant: site data

Solar power plant in Likarivka, Oleksandriiskyi Raion, Kirovohrad Oblast

Likarivka: 1,160 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,157). #104 of 191 in the rayon, #270 of 708 in the oblast.

Oleksandriya, the rayon centre, is 15 km away. 131 m above sea level. 15 km away: Oleksandriya, the nearest bigger centre, the same 1,156. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 74 km. 10.80 m between rows, pitch 14.67 m (latitude 48.8°).

Yield of 1 kWp
1,160kWh/year
Tilt
36°2° east of south
10 kW
11,603kWh/year
Row pitch
14.67m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Likarivka

The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 74 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb91Mar120Apr140May146Jun151Jul148Aug120Sep89Oct41Nov26Dec

July: 151 kWh/kWp, December: 26 — 5.8 times less.

December: 26 against 28 in the oblast, 7.1% less.

Likarivka: plants, kWh
kWpA yearJulyDecember
55,802755130
1011,6031,510260
1517,4052,265390

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Oleksandriiskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.