Solar plant: site data
Solar power plant in Lebedynka, Holovanivskyi Raion, Kirovohrad Oblast
Lebedynka: 1,152 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). Exactly the oblast median (1,157). #126 of 171 in the rayon, #558 of 708 in the oblast.
Hayvoron, the rayon centre, is 55 km away. 131 m above sea level. 12 km away: Holovanivsk, the nearest bigger centre, 1,160 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 123 km. 10.54 m between rows, pitch 14.41 m (latitude 48.5°).
- Yield of 1 kWp
- 1,152kWh/year
- Tilt
- 36°4° east of south
- 10 kW
- 11,522kWh/year
- Row pitch
- 14.41m · GCR 0.33
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,230 / 410Pa
Ground frame designer
A ground frame for a solar plant: Lebedynka
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 123 km: snow 1,230 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 148 kWh/kWp, December: 29 — 5.1 times less.
December: 29 against 28 in the oblast, 3.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,761 | 740 | 145 |
| 10 | 11,522 | 1,480 | 290 |
| 15 | 17,283 | 2,220 | 435 |
Example: a 10 kW ground frame
For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.
How these numbers are computed
Nearby
- Leschivka1 km1,152 kWh/kWp
- Tabanove2 km1,153 kWh/kWp
- Ternove3 km1,154 kWh/kWp
- Davydivka5 km1,153 kWh/kWp
- Orlove5 km1,152 kWh/kWp
- Shevchenka6 km1,152 kWh/kWp
All places: Holovanivskyi RaionKirovohrad Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.