Solar power plant in Hlodosy, Novoukrainskyi Raion, Kirovohrad Oblast

Hlodosy: 1,138 kWh per kWp a year, tilt 35° facing south (PVGIS). 1.7% below the oblast median (1,157). #90 of 92 in the rayon, #705 of 708 in the oblast.

Novoukrayinka, the rayon centre, is 22 km away. 151 m above sea level. 13 km away: Dobrovelychkivka, the nearest bigger centre, 1,148 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 69 km. 10.28 m between rows, pitch 14.20 m (latitude 48.5°).

Yield of 1 kWp
1,138kWh/year
Tilt
35°facing south
10 kW
11,376kWh/year
Row pitch
14.20m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Hlodosy

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 69 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan49Feb90Mar120Apr137May141Jun149Jul145Aug118Sep90Oct41Nov27Dec

July: 149 kWh/kWp, December: 27 — 5.5 times less.

January: 31 against 35 in the oblast, 11.4% less.

Hlodosy: plants, kWh
kWpA yearJulyDecember
55,688745135
1011,3761,490270
1517,0642,235405

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novoukrainskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.