Solar plant: site data

Solar power plant in Chemerpil, Holovanivskyi Raion, Kirovohrad Oblast

Chemerpil: 1,170 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.1% above the oblast median (1,157). #1 of 171 in the rayon, #78 of 708 in the oblast.

Hayvoron, the rayon centre, is 29 km away. 101 m above sea level. 5 km away: Savran, the nearest bigger centre, the same 1,170. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 162 km. 10.32 m between rows, pitch 14.19 m (latitude 48.2°).

Yield of 1 kWp
1,170kWh/year
Tilt
36°3° east of south
10 kW
11,703kWh/year
Row pitch
14.19m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Chemerpil

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 162 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan55Feb99Mar120Apr137May140Jun148Jul145Aug118Sep91Oct43Nov34Dec

July: 148 kWh/kWp, December: 34 — 4.4 times less.

December: 34 against 28 in the oblast, 21.4% more.

Chemerpil: plants, kWh
kWpA yearJulyDecember
55,852740170
1011,7031,480340
1517,5552,220510

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Holovanivskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.