Solar plant: site data
Solar power plant in Bobrynets, Kropyvnytskyi Raion, Kirovohrad Oblast
Bobrynets: 1,167 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 0.8% above the oblast median (1,157). #68 of 254 in the rayon, #125 of 708 in the oblast.
Kropyvnytskyi, the rayon centre, is 51 km away. 136 m above sea level. 48 km away: Novyi Buh, the nearest bigger centre, 1,181 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 51 km. 10.25 m between rows, pitch 14.12 m (latitude 48.1°).
- Yield of 1 kWp
- 1,167kWh/year
- Tilt
- 36°4° east of south
- 10 kW
- 11,671kWh/year
- Row pitch
- 14.12m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,230 / 410Pa
Ground frame designer
A ground frame for a solar plant: Bobrynets
The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 51 km: snow 1,230 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 152 kWh/kWp, December: 29 — 5.2 times less.
November: 43 against 41 in the oblast, 4.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,836 | 760 | 145 |
| 10 | 11,671 | 1,520 | 290 |
| 15 | 17,507 | 2,280 | 435 |
Example: a 10 kW ground frame
For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.
How these numbers are computed
Nearby
- Shliakhove4 km1,170 kWh/kWp
- Bohdanivka7 km1,171 kWh/kWp
- Oleksiivka8 km1,167 kWh/kWp
- Zlatopillia10 km1,167 kWh/kWp
- Chervonopillia10 km1,173 kWh/kWp
- Tarasivka10 km1,175 kWh/kWp
All places: Kropyvnytskyi RaionKirovohrad Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.