Solar plant: site data

Solar power plant in Bashtyne, Oleksandriiskyi Raion, Kirovohrad Oblast

Bashtyne: 1,164 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.6% above the oblast median (1,157). #70 of 191 in the rayon, #169 of 708 in the oblast.

Oleksandriya, the rayon centre, is 52 km away. 114 m above sea level. 16 km away: Petrove, the nearest bigger centre, the same 1,169. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 76 km. 10.36 m between rows, pitch 14.23 m (latitude 48.2°).

Yield of 1 kWp
1,164kWh/year
Tilt
36°3° east of south
10 kW
11,642kWh/year
Row pitch
14.23m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Bashtyne

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 76 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan52Feb91Mar119Apr138May144Jun152Jul149Aug123Sep91Oct43Nov27Dec

July: 152 kWh/kWp, December: 27 — 5.6 times less.

November: 43 against 41 in the oblast, 4.9% more.

Bashtyne: plants, kWh
kWpA yearJulyDecember
55,821760135
1011,6421,520270
1517,4632,280405

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Oleksandriiskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.