Solar plant: site data
Solar power plant in Zhemelintsy, Shepetivskyi Raion, Khmelnytskyi Oblast
Zhemelintsy: 1,086 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.3% below the oblast median (1,100). #227 of 307 in the rayon, #933 of 1109 in the oblast.
Shepetivka, the rayon centre, is 52 km away. 244 m above sea level. 2 km away: Bilohirya, the nearest bigger centre, the same 1,086. Snow and wind from the nearest regional centre in the DBN — Рівне, 72 km. 11.78 m between rows, pitch 15.65 m (latitude 50.0°).
- Yield of 1 kWp
- 1,086kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 10,861kWh/year
- Row pitch
- 15.65m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,320 / 520Pa
Ground frame designer
A ground frame for a solar plant: Zhemelintsy
The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 72 km: snow 1,320 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 139 kWh/kWp, December: 27 — 5.1 times less.
January: 29 against 32 in the oblast, 9.4% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,431 | 695 | 135 |
| 10 | 10,861 | 1,390 | 270 |
| 15 | 16,291 | 2,085 | 405 |
Example: a 10 kW ground frame
For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Bilohirya2 km1,086 kWh/kWp
- Mokrovolya3 km1,086 kWh/kWp
- Semeniv4 km1,085 kWh/kWp
- Myklashi5 km1,086 kWh/kWp
- Denysivka7 km1,078 kWh/kWp
- Trostyanka7 km1,095 kWh/kWp
All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.