Solar plant: site data

Solar power plant in Trebukhivtsi, Khmelnytskyi Raion, Khmelnytskyi Oblast

Trebukhivtsi: 1,108 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.7% above the oblast median (1,100). #156 of 576 in the rayon, #399 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 32 km away. 278 m above sea level. 16 km away: Letychiv, the nearest bigger centre, the same 1,113. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 31 km. 11.30 m between rows, pitch 15.17 m (latitude 49.4°).

Yield of 1 kWp
1,108kWh/year
Tilt
36°2° east of south
10 kW
11,075kWh/year
Row pitch
15.17m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Trebukhivtsi

The designer opens with this place’s coordinates, latitude 49.4° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 31 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb90Mar117Apr134May138Jun140Jul137Aug112Sep85Oct38Nov30Dec

July: 140 kWh/kWp, December: 30 — 4.7 times less.

January: 35 against 32 in the oblast, 9.4% more.

Trebukhivtsi: plants, kWh
kWpA yearJulyDecember
55,538700150
1011,0751,400300
1516,6132,100450

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.