Solar plant: site data

Solar power plant in Teremkivtsi, Kamianets-Podilskyi Raion, Khmelnytskyi Oblast

Teremkivtsi: 1,117 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.5% above the oblast median (1,100). #188 of 226 in the rayon, #270 of 1109 in the oblast.

Kamyanets-Podilskyi, the rayon centre, is 44 km away. 301 m above sea level. 22 km away: Horodok, the nearest bigger centre, 1,101 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 63 km. 11.25 m between rows, pitch 15.07 m (latitude 49.0°).

Yield of 1 kWp
1,117kWh/year
Tilt
37°2° east of south
10 kW
11,170kWh/year
Row pitch
15.07m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Teremkivtsi

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 63 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan54Feb95Mar117Apr133May136Jun140Jul138Aug113Sep84Oct39Nov32Dec

July: 140 kWh/kWp, December: 32 — 4.4 times less.

January: 37 against 32 in the oblast, 15.6% more.

Teremkivtsi: plants, kWh
kWpA yearJulyDecember
55,585700160
1011,1701,400320
1516,7552,100480

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kamianets-Podilskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.