Solar plant: site data

Solar power plant in Stari Beizymy, Shepetivskyi Raion, Khmelnytskyi Oblast

Stari Beizymy: 1,086 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.3% below the oblast median (1,100). #230 of 307 in the rayon, #939 of 1109 in the oblast.

Shepetivka, the rayon centre, is 26 km away. 261 m above sea level. 22 km away: Iziaslav, the nearest bigger centre, 1,092 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 59 km. 11.76 m between rows, pitch 15.63 m (latitude 50.0°).

Yield of 1 kWp
1,086kWh/year
Tilt
36°1° east of south
10 kW
10,857kWh/year
Row pitch
15.63m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Stari Beizymy

The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 59 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan47Feb83Mar118Apr134May138Jun140Jul137Aug111Sep83Oct37Nov27Dec

July: 140 kWh/kWp, December: 27 — 5.2 times less.

February: 47 against 51 in the oblast, 7.8% less.

Stari Beizymy: plants, kWh
kWpA yearJulyDecember
55,429700135
1010,8571,400270
1516,2862,100405

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.