Solar plant: site data
Solar power plant in Rozhny, Khmelnytskyi Raion, Khmelnytskyi Oblast
Rozhny: 1,116 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.4% above the oblast median (1,100). #92 of 576 in the rayon, #288 of 1109 in the oblast.
Khmelnytskyi, the rayon centre, is 50 km away. 268 m above sea level. 11 km away: Stara Synyava, the nearest bigger centre, 1,109 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 49 km. 11.36 m between rows, pitch 15.23 m (latitude 49.5°).
- Yield of 1 kWp
- 1,116kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,159kWh/year
- Row pitch
- 15.23m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Rozhny
The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 49 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 141 kWh/kWp, December: 30 — 4.7 times less.
January: 34 against 32 in the oblast, 6.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,580 | 705 | 150 |
| 10 | 11,159 | 1,410 | 300 |
| 15 | 16,739 | 2,115 | 450 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Yurchenky3 km1,115 kWh/kWp
- Kudynka4 km1,122 kWh/kWp
- Svichna5 km1,117 kWh/kWp
- Shcherbani5 km1,115 kWh/kWp
- Chekhy5 km1,115 kWh/kWp
- Novokonstiantyniv5 km1,122 kWh/kWp
All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.