Solar plant: site data

Solar power plant in Pyliai, Shepetivskyi Raion, Khmelnytskyi Oblast

Pyliai: 1,096 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,100). #133 of 307 in the rayon, #663 of 1109 in the oblast.

Shepetivka, the rayon centre, is 13 km away. 294 m above sea level. 13 km away: Shepetivka, the nearest bigger centre, 1,085 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 72 km. 12.15 m between rows, pitch 15.97 m (latitude 50.1°).

Yield of 1 kWp
1,096kWh/year
Tilt
37°1° east of south
10 kW
10,958kWh/year
Row pitch
15.97m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Pyliai

The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 72 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan51Feb88Mar118Apr134May138Jun140Jul137Aug112Sep83Oct36Nov28Dec

July: 140 kWh/kWp, December: 28 — 5.0 times less.

January: 30 against 32 in the oblast, 6.3% less.

Pyliai: plants, kWh
kWpA yearJulyDecember
55,479700140
1010,9581,400280
1516,4372,100420

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.