Solar power plant in Pechesky, Khmelnytskyi Raion, Khmelnytskyi Oblast
Pechesky: 1,105 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,100). #173 of 576 in the rayon, #453 of 1109 in the oblast.
Khmelnytskyi, the rayon centre, is 15 km away. 337 m above sea level. 15 km away: Khmelnytskyi, the nearest bigger centre, 1,099 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 14 km. 11.39 m between rows, pitch 15.26 m (latitude 49.5°).
- Yield of 1 kWp
- 1,105kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,049kWh/year
- Row pitch
- 15.26m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Pechesky
The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 14 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 140 kWh/kWp, December: 31 — 4.5 times less.
December: 31 against 29 in the oblast, 6.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,525 | 700 | 155 |
| 10 | 11,049 | 1,400 | 310 |
| 15 | 16,574 | 2,100 | 465 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Khodakivtsi1 km1,100 kWh/kWp
- Pashutyntsi5 km1,101 kWh/kWp
- Pashkivtsi5 km1,102 kWh/kWp
- Stufchyntsi5 km1,102 kWh/kWp
- Veselivka6 km1,103 kWh/kWp
- Zaruddia7 km1,098 kWh/kWp
All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.