Solar plant: site data

Solar power plant in Myrutyn, Shepetivskyi Raion, Khmelnytskyi Oblast

Myrutyn: 1,102 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,100). #84 of 307 in the rayon, #508 of 1109 in the oblast.

Shepetivka, the rayon centre, is 34 km away. 216 m above sea level. 25 km away: Slavuta, the nearest bigger centre, 1,070 — 3.0% more here. Snow and wind from the nearest regional centre in the DBN — Рівне, 59 km. 12.55 m between rows, pitch 16.37 m (latitude 50.5°).

Yield of 1 kWp
1,102kWh/year
Tilt
37°1° east of south
10 kW
11,022kWh/year
Row pitch
16.37m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Myrutyn

The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 59 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan55Feb93Mar118Apr134May138Jun139Jul136Aug110Sep82Oct37Nov28Dec

July: 139 kWh/kWp, December: 28 — 5.0 times less.

February: 55 against 51 in the oblast, 7.8% more.

Myrutyn: plants, kWh
kWpA yearJulyDecember
55,511695140
1011,0221,390280
1516,5332,085420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.