Solar plant: site data

Solar power plant in Mynkivtsi, Shepetivskyi Raion, Khmelnytskyi Oblast

Mynkivtsi: 1,091 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.9% below the oblast median (1,100). #185 of 307 in the rayon, #801 of 1109 in the oblast.

Shepetivka, the rayon centre, is 16 km away. 250 m above sea level. 9 km away: Slavuta, the nearest bigger centre, 1,070 — 2.0% more here. Snow and wind from the nearest regional centre in the DBN — Рівне, 63 km. 12.39 m between rows, pitch 16.21 m (latitude 50.3°).

Yield of 1 kWp
1,091kWh/year
Tilt
37°2° east of south
10 kW
10,907kWh/year
Row pitch
16.21m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Mynkivtsi

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 63 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan55Feb91Mar116Apr131May135Jun137Jul135Aug110Sep81Oct37Nov29Dec

July: 137 kWh/kWp, December: 29 — 4.7 times less.

February: 55 against 51 in the oblast, 7.8% more.

Mynkivtsi: plants, kWh
kWpA yearJulyDecember
55,454685145
1010,9071,370290
1516,3612,055435

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.