Solar plant: site data

Solar power plant in Mykhailivka, Shepetivskyi Raion, Khmelnytskyi Oblast

Mykhailivka: 1,081 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.8% below the oblast median (1,100). #269 of 307 in the rayon, #1023 of 1109 in the oblast.

Shepetivka, the rayon centre, is 71 km away. 270 m above sea level. 20 km away: Bilohirya, the nearest bigger centre, 1,086 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 59 km. 11.76 m between rows, pitch 15.63 m (latitude 49.9°).

Yield of 1 kWp
1,081kWh/year
Tilt
36°1° east of south
10 kW
10,806kWh/year
Row pitch
15.63m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Mykhailivka

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 59 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

28Jan48Feb83Mar118Apr134May136Jun140Jul137Aug111Sep83Oct35Nov29Dec

July: 140 kWh/kWp, January: 28 — 5.0 times less.

January: 28 against 32 in the oblast, 12.5% less.

Mykhailivka: plants, kWh
kWpA yearJulyJanuary
55,403700140
1010,8061,400280
1516,2092,100420

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.