Solar plant: site data
Solar power plant in Malyi Karabchiiv, Kamianets-Podilskyi Raion, Khmelnytskyi Oblast
Malyi Karabchiiv: 1,112 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.1% above the oblast median (1,100). #215 of 226 in the rayon, #340 of 1109 in the oblast.
Kamyanets-Podilskyi, the rayon centre, is 43 km away. 306 m above sea level. 16 km away: Horodok, the nearest bigger centre, 1,101 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 46 km. 11.00 m between rows, pitch 14.87 m (latitude 49.1°).
- Yield of 1 kWp
- 1,112kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 11,122kWh/year
- Row pitch
- 14.87m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Malyi Karabchiiv
The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 46 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 141 kWh/kWp, December: 32 — 4.4 times less.
December: 32 against 29 in the oblast, 10.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,561 | 705 | 160 |
| 10 | 11,122 | 1,410 | 320 |
| 15 | 16,683 | 2,115 | 480 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Tynna4 km1,115 kWh/kWp
- Mala Ternavka5 km1,114 kWh/kWp
- Sosnivka5 km1,103 kWh/kWp
- Kosohirka6 km1,110 kWh/kWp
- Tomashivka6 km1,114 kWh/kWp
- Stara Pisochna6 km1,112 kWh/kWp
All places: Kamianets-Podilskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.