Solar plant: site data

Solar power plant in Lozny, Khmelnytskyi Raion, Khmelnytskyi Oblast

Lozny: 1,127 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 2.5% above the oblast median (1,100). #10 of 576 in the rayon, #146 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 62 km away. 313 m above sea level. 16 km away: Letychiv, the nearest bigger centre, 1,113 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 48 km. 11.21 m between rows, pitch 15.08 m (latitude 49.3°).

Yield of 1 kWp
1,127kWh/year
Tilt
36°1° east of south
10 kW
11,271kWh/year
Row pitch
15.08m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Lozny

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 48 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan53Feb90Mar119Apr137May140Jun142Jul139Aug114Sep86Oct39Nov32Dec

July: 142 kWh/kWp, December: 32 — 4.4 times less.

January: 36 against 32 in the oblast, 12.5% more.

Lozny: plants, kWh
kWpA yearJulyDecember
55,636710160
1011,2711,420320
1516,9072,130480

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.