Solar plant: site data
Solar power plant in Lisne, Shepetivskyi Raion, Khmelnytskyi Oblast
Lisne: 1,092 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.7% below the oblast median (1,100). #171 of 307 in the rayon, #772 of 1109 in the oblast.
Shepetivka, the rayon centre, is 28 km away. 258 m above sea level. 9 km away: Polonne, the nearest bigger centre, 1,103 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 86 km. 12.27 m between rows, pitch 16.09 m (latitude 50.2°).
- Yield of 1 kWp
- 1,092kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 10,923kWh/year
- Row pitch
- 16.09m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Lisne
The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 86 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 139 kWh/kWp, December: 28 — 5.0 times less.
December: 28 against 29 in the oblast, 3.4% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,462 | 695 | 140 |
| 10 | 10,923 | 1,390 | 280 |
| 15 | 16,385 | 2,085 | 420 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.
How these numbers are computed
Nearby
- Burtyn4 km1,085 kWh/kWp
- Zalissia5 km1,091 kWh/kWp
- Poninka5 km1,095 kWh/kWp
- Novaky9 km1,090 kWh/kWp
- Lypivka9 km1,098 kWh/kWp
- Polonne9 km1,103 kWh/kWp
All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.