Solar plant: site data
Solar power plant in Novaky, Shepetivskyi Raion, Khmelnytskyi Oblast
Novaky: 1,090 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.9% below the oblast median (1,100). #191 of 307 in the rayon, #820 of 1109 in the oblast.
Shepetivka, the rayon centre, is 25 km away. 247 m above sea level. 18 km away: Polonne, the nearest bigger centre, 1,103 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 90 km. 12.34 m between rows, pitch 16.16 m (latitude 50.3°).
- Yield of 1 kWp
- 1,090kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 10,898kWh/year
- Row pitch
- 16.16m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Novaky
The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 90 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 138 kWh/kWp, December: 29 — 4.8 times less.
January: 36 against 32 in the oblast, 12.5% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,449 | 690 | 145 |
| 10 | 10,898 | 1,380 | 290 |
| 15 | 16,347 | 2,070 | 435 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.
How these numbers are computed
Nearby
- Khmelivka2 km1,090 kWh/kWp
- Derevyshchyna3 km1,096 kWh/kWp
- Sudymont5 km1,083 kWh/kWp
- Maidan-Labun5 km1,104 kWh/kWp
- Burtyn5 km1,085 kWh/kWp
- Zhary5 km1,105 kWh/kWp
All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.