Solar plant: site data

Solar power plant in Novaky, Shepetivskyi Raion, Khmelnytskyi Oblast

Novaky: 1,090 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.9% below the oblast median (1,100). #191 of 307 in the rayon, #820 of 1109 in the oblast.

Shepetivka, the rayon centre, is 25 km away. 247 m above sea level. 18 km away: Polonne, the nearest bigger centre, 1,103 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 90 km. 12.34 m between rows, pitch 16.16 m (latitude 50.3°).

Yield of 1 kWp
1,090kWh/year
Tilt
37°2° east of south
10 kW
10,898kWh/year
Row pitch
16.16m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Novaky

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 90 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan54Feb90Mar115Apr130May136Jun138Jul135Aug110Sep81Oct36Nov29Dec

July: 138 kWh/kWp, December: 29 — 4.8 times less.

January: 36 against 32 in the oblast, 12.5% more.

Novaky: plants, kWh
kWpA yearJulyDecember
55,449690145
1010,8981,380290
1516,3472,070435

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.