Kurianky: 1,098 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,100). #115 of 307 in the rayon, #611 of 1109 in the oblast.

Shepetivka, the rayon centre, is 51 km away. 278 m above sea level. 13 km away: Bilohirya, the nearest bigger centre, 1,086 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Рівне, 57 km. 12.19 m between rows, pitch 16.01 m (latitude 50.1°).

Yield of 1 kWp
1,098kWh/year
Tilt
37°2° east of south
10 kW
10,977kWh/year
Row pitch
16.01m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Kurianky

The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 57 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan53Feb91Mar118Apr134May136Jun138Jul137Aug112Sep83Oct36Nov29Dec

July: 138 kWh/kWp, December: 29 — 4.8 times less.

February: 53 against 51 in the oblast, 3.9% more.

Kurianky: plants, kWh
kWpA yearJulyDecember
55,489690145
1010,9771,380290
1516,4662,070435

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.