Solar plant: site data

Solar power plant in Kryvachyntsi, Khmelnytskyi Raion, Khmelnytskyi Oblast

Kryvachyntsi: 1,093 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.6% below the oblast median (1,100). #361 of 576 in the rayon, #744 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 40 km away. 310 m above sea level. 17 km away: Volochysk, the nearest bigger centre, 1,083 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 41 km. 11.35 m between rows, pitch 15.22 m (latitude 49.5°).

Yield of 1 kWp
1,093kWh/year
Tilt
36°2° east of south
10 kW
10,932kWh/year
Row pitch
15.22m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Kryvachyntsi

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 41 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan50Feb89Mar117Apr133May135Jun139Jul137Aug113Sep83Oct37Nov30Dec

July: 139 kWh/kWp, January: 30 — 4.6 times less.

January: 30 against 32 in the oblast, 6.3% less.

Kryvachyntsi: plants, kWh
kWpA yearJulyJanuary
55,466695150
1010,9321,390300
1516,3982,085450

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.