Solar plant: site data
Solar power plant in Khutory, Khmelnytskyi Raion, Khmelnytskyi Oblast
Khutory: 1,096 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). Exactly the oblast median (1,100). #301 of 576 in the rayon, #659 of 1109 in the oblast.
Khmelnytskyi, the rayon centre, is 47 km away. 298 m above sea level. 6 km away: Starokostyantyniv, the nearest bigger centre, the same 1,094. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 46 km. 11.63 m between rows, pitch 15.50 m (latitude 49.8°).
- Yield of 1 kWp
- 1,096kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 10,959kWh/year
- Row pitch
- 15.50m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Khutory
The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 46 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 141 kWh/kWp, December: 28 — 5.0 times less.
March: 85 against 89 in the oblast, 4.5% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,480 | 705 | 140 |
| 10 | 10,959 | 1,410 | 280 |
| 15 | 16,439 | 2,115 | 420 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Radkivtsi2 km1,096 kWh/kWp
- Popivtsi3 km1,096 kWh/kWp
- Nemyrivka4 km1,095 kWh/kWp
- Demkivtsi4 km1,095 kWh/kWp
- Hromivka4 km1,095 kWh/kWp
- Zhabche5 km1,097 kWh/kWp
All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.