Solar plant: site data

Solar power plant in Humentsi, Kamianets-Podilskyi Raion, Khmelnytskyi Oblast

Humentsi: 1,128 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 2.5% above the oblast median (1,100). #127 of 226 in the rayon, #134 of 1109 in the oblast.

Kamyanets-Podilskyi, the rayon centre, is 10 km away. 217 m above sea level. 10 km away: Kamyanets-Podilskyi, the nearest bigger centre, the same 1,129. Snow and wind from the nearest regional centre in the DBN — Чернівці, 73 km. 10.77 m between rows, pitch 14.64 m (latitude 48.8°).

Yield of 1 kWp
1,128kWh/year
Tilt
36°1° east of south
10 kW
11,279kWh/year
Row pitch
14.64m · GCR 0.33
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Humentsi

The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 73 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan53Feb94Mar119Apr134May136Jun141Jul139Aug115Sep86Oct40Nov33Dec

July: 141 kWh/kWp, December: 33 — 4.3 times less.

January: 38 against 32 in the oblast, 18.8% more.

Humentsi: plants, kWh
kWpA yearJulyDecember
55,640705165
1011,2791,410330
1516,9192,115495

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kamianets-Podilskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.