Solar plant: site data

Solar power plant in Horodok, Khmelnytskyi Raion, Khmelnytskyi Oblast

Horodok: 1,101 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). Exactly the oblast median (1,100). #216 of 576 in the rayon, #535 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 41 km away. 285 m above sea level. 41 km away: Khmelnytskyi, the nearest bigger centre, the same 1,099. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 41 km. 11.09 m between rows, pitch 14.96 m (latitude 49.2°).

Yield of 1 kWp
1,101kWh/year
Tilt
36°4° east of south
10 kW
11,011kWh/year
Row pitch
14.96m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Horodok

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 41 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan51Feb91Mar117Apr134May137Jun141Jul138Aug113Sep83Oct37Nov29Dec

July: 141 kWh/kWp, December: 29 — 4.9 times less.

January: 30 against 32 in the oblast, 6.3% less.

Horodok: plants, kWh
kWpA yearJulyDecember
55,506705145
1011,0111,410290
1516,5172,115435

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.