Solar plant: site data

Solar power plant in Horodniavka, Shepetivskyi Raion, Khmelnytskyi Oblast

Horodniavka: 1,087 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.2% below the oblast median (1,100). #221 of 307 in the rayon, #910 of 1109 in the oblast.

Shepetivka, the rayon centre, is 19 km away. 236 m above sea level. 19 km away: Shepetivka, the nearest bigger centre, the same 1,085. Snow and wind from the nearest regional centre in the DBN — Рівне, 80 km. 12.37 m between rows, pitch 16.19 m (latitude 50.3°).

Yield of 1 kWp
1,087kWh/year
Tilt
37°2° east of south
10 kW
10,866kWh/year
Row pitch
16.19m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Horodniavka

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 80 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb91Mar115Apr130May136Jun137Jul135Aug109Sep80Oct36Nov28Dec

July: 137 kWh/kWp, December: 28 — 4.9 times less.

January: 35 against 32 in the oblast, 9.4% more.

Horodniavka: plants, kWh
kWpA yearJulyDecember
55,433685140
1010,8661,370280
1516,2992,055420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.